Tanaka Award 2015
Tanaka Award was established to honor Dr. Tanaka for his pioneering contribution to bridge and structural engineering in 1966. The award has recognized remarkable success, excellence, and contribution, at the same time, gained recognition internationally.

The following four concrete bridges have been awarded Tanaka Award 2015 by JSCE:
- Nhat Tan Bridge
- Genta Bridge
- Ootagawa Bridge
- Irabu Bridge





Nhat Tan Bridge

Owner: Ministry of Transport PMU85
Design: Chodai Co., Ltd., Nippon Engineering Consultants Co., Ltd., and TEDI
(Transport Engineering Design Inc., Vietnam)
Construction: IHI Infrastructure Systems Co., Ltd. and Sumitomo Mitsui Construction Co., Ltd. JV
Location: Hanoi City, The Socialist Republic of Vietnam
Structural Type: Two main steel I girders, six-span continuous composite cable-stayed bridge
Bridge Length: 1,500 m; central span: 300 m
More information of this bridge(pdf file)




Renovation of the Genta Bridge

Owner: Tottori prefectural government
Design: PASCO Corporation
Construction: Superstructure: Fuji P.S, Ube Machinery, Takanogumi Construction JV, Kyokuto, Takada, and Agatsuma JV
Substructure: Kuriyma Corporation, Yamakou Construction Co., Ltd.
Location: Genta to Kuniyasu, Tottori City
Structural Type: RC 16-span continuous Gerber girder
Bridge Length: 358 m
More information of this bridge(pdf file)




Ootagawa Bridge

Owner: Hiroshima Municipal Government (Streetscape Section of Road Department of Road Traffic Bureau)
Design: Eight-Japan Engineering Consultants Inc.
Construction: Shimizu Corporation
Location: Hiroshima City
Structural Type: Six-span continuous steel and concrete composite bridge
Bridge Length: 412 m; maximum span 116 m
More information of this bridge(pdf file)




Irabu Bridge

Owner: Okinawa Prefectural Government
Location: Remote islands of Miyakojima and Irabujima
Structural Type: PC continuous box girder bridge (general section), steel floor-slab box-girder bridge
(main line section), and hollow floor slab (installed bridge)
Bridge Length: 6,500 m (main bridge: 3,540 m and submarine road: 600 m, installed bridge: 170 m,
and installed road: 2,190 m)
More information of this bridge(pdf file)